That half of the job, the slab and the erection, goes to one independent metal building contractor, and no published price exists for it; the figure depends on the lot. The permit is still the owner's to pull, in Travis, Williamson or Burnet County or inside a city limit, and none of that paperwork travels with the steel.
Inside Burnet
City building permit for any added structure
Per the City of Burnet Building Department, a building permit is needed for construction that adds a structure to the property or physically alters one; the page lists a Commercial Building Permit among its permit types, names garages and accessory structures such as storage sheds over 120 square feet among the projects that need one, and says building can begin once the permit is issued and the permit runs out after 180 days if construction has not continued.
From City of Burnet Building Department, 301 E Jackson St (read September 20, 2026).
Burnet County, outside city limits
County building permit: Class A $25, Class B $400 inside a flood hazard boundary
Burnet County requires building and septic permits, in a fixed order: a 911 address for any new residence or business first, then the building permit, and the county issues no septic permit until the building permit exists.
From Burnet County, on-site sewage facilities and development permits (read September 20, 2026).
Burnet County: the city desk and the county desk, each read at its own page. The other five counties have sheets of their own. The whole record is on that county's sheet.
Steel erection for pre-engineered packages in Central Texas: what does the kit leave to you?
The foundation and the labor. A Texas manufacturer that prints kit prices on its own site states the split in its own words: the listed price is for the building kit only, tax and freight are not included, the door is not included, and the company says it does not provide the foundation and does not offer installation or erection. Those prices are subject to change without notice. The same manufacturer lists branch stores in Bastrop, in Spicewood, its West Austin branch, and in Marble Falls, all three inside these six counties, so an owner here can buy steel close to home and still have nothing in the ground.
What is left is a project of its own: a designed foundation, anchor bolts set to the building's own template, a crew and the equipment to stand the frames, and a permit application in the owner's name. Where that sits in the full sequence, from the lot to the finished shell, is on the Austin-area metal building route.
One Texas manufacturer's own kit pages, read 2026-09-20: what the listed price covers and what it does not.
On a phone this table scrolls sideways.
| Part of the job | What the manufacturer's own pages say |
|---|---|
| The steel package | The listed price is for the building kit only |
| Tax and freight | Not included in the kit price |
| The door | Not included in the kit price |
| The foundation | The manufacturer says it does not provide the foundation |
| Installation and erection | The manufacturer says it does not offer installation or erection |
| The listed price itself | Subject to change without notice |
| Where the kits sell inside this footprint | Branch stores listed in Bastrop, in Spicewood, its West Austin branch, and in Marble Falls |
FromMueller, Inc., Standard Series Big Workshop 30 x 40 x 12 and Big Barn XL 40 x 60 x 16 product pages, and its Texas branch location pages (read September 20, 2026).
Who designs the slab and sets the anchor bolts under a package you already own?
A foundation designer working from the frame reactions on your own drawings, with a Texas professional engineer on the sealed sheets wherever the statute or the permitting office calls for one. The engineering exemption in Occupations Code 1001.056(a)(2)(F) ends past a single story, past 5,000 square feet of total floor area, or past a 24-foot clear span across the short side, and it holds only when the public is offered no engineering services. Wider spans shrink the duty under subsection (b) to the roof-carrying parts: trusses, beams and the like, which must be engineered or pre-engineered. A package answers that for the frame. It answers nothing about what the frame sits on.
On the clay east of Austin the exemption thins again. Subsection (c) withdraws the small-building exemption for a residential slab on expansive soil unless the work meets the International Residential Code as applied in the jurisdiction. The bolt pattern, the bolt diameter and the projection above the concrete all come off the manufacturer's own sheets, and they go in before the pour, not after it. That is the single detail that decides whether the first day of erection is a day of work or a day of measuring.
FromTexas Legislature Online, Occupations Code Chapter 1001, engineers (read September 20, 2026).
Does the building permit come with the package?
No. The owner applies at whichever office has the lot, and the three counties a package most often lands in answer the question three different ways. Burnet County requires building and septic permits in a fixed order, a 911 address for any new residence or business first, then the building permit, and issues no septic permit until the building permit exists; one application carries two classes, split at the flood hazard line (Class A clear of every flood hazard area, Class B within a designated flood hazard boundary), and its page names no building code and describes no plan review. Outside city limits Travis County requires a Development Permit, and a commercial project that is not a dwelling applies for a Development (Non-Residential) permit with a sealed construction cost estimate and a site plan sealed by a Texas-licensed engineer. Williamson County's own pages state that the county issues no building permits, has not adopted the Local Government Code 233 residential building code standards and has no authority to issue a Certificate of Occupancy, and that a property inside a city or its extraterritorial jurisdiction is the city's to check. The office, the phone and the fees for the county above are on the Burnet County sheet.
One statewide rule comes ahead of that application. Under Government Code 469.102 the plans are filed by whoever holds overall design responsibility (architect, interior designer, landscape architect or engineer) within 20 days of their issue, weekends and legal holidays not counted. Until then the owner can neither file for a local building permit nor begin construction, and for a building at or over the $50,000 line no local permit official can accept the application without verifying the department registration. Which buildings that line reaches, and what registration costs, is on the $50,000 TDLR sheet.
FromTexas Legislature Online, Government Code Chapter 469, elimination of architectural barriers (read September 20, 2026). FromBurnet County, on-site sewage facilities and development permits (read September 20, 2026). FromTravis County TNR Development Services, Commercial Site Plan (read September 20, 2026). The source was read and does not list this. FromWilliamson County, frequently asked questions, infrastructure and developers (read September 20, 2026).
Nobody in Texas is licensed to build, so how do you pick an erector?
On the record in front of you, because the credential people look for is not one Texas offers: the state licenses neither house building nor general contracting. None of the 41 regulated industries on the Department of Licensing and Regulation's roster covers either, and the Sunset Advisory Commission records that the Legislature did not continue the Texas Residential Construction Commission in 2009, its Act expiring September 1, 2009. So this site calls no contractor licensed.
The trades that do carry a state license hold it separately from the builder. Anyone contracting to install, repair or maintain heating, air conditioning or refrigeration systems needs a TDLR license; TDLR also issues every electrical license, apprentice up through master electrician and electrical contractor; and plumbing licenses come from the Texas State Board of Plumbing Examiners. So a shop that will be conditioned brings state-licensed trades onto the job even though the steel itself brings none. What is left to check on the erection side is insurance, the lift or crane the span calls for, work on buildings of your width and eave height, and whether an erector will set a package the owner bought rather than only steel from its own supplier.
FromTexas Department of Licensing and Regulation, regulated industries, and the Sunset Advisory Commission on the Texas Residential Construction Commission (read September 20, 2026). FromTexas Department of Licensing and Regulation, Air Conditioning and Refrigeration Contractors and Electricians program pages (read September 20, 2026).
The order of work on site
Dirt, then concrete, then steel, in that order and with no overlap worth taking. The pad is cut, shaped and compacted and the site is drained away from the building line; under-slab plumbing and any conduit go in; forms and reinforcing are set; the anchor bolts go in on their template; the concrete is placed and left to reach the strength the foundation sheet names. The pad, grading and stormwater acreage covers that first stage on this ground.
Erection follows in a fixed sequence: base plates down over the bolts, rigid frames stood and braced, purlins and girts run, the frame squared and plumbed, then roof and wall sheeting, trim, gutters and the doors. Delivery timing is the part an owner controls least. The steel ships on the manufacturer's schedule rather than the erector's, and a load that lands beside a slab that is not ready sits outside taking weather while the bolts cure. Booking the foundation and the erection against a known delivery date is the practical shape of the whole job, and it is the first thing worth saying when you ask for a price.
Who prices the slab and the erection
One independent metal building contractor. No published price exists for erection on a finished building here; it depends on the lot. No metal building contractor whose own site names Austin or these six counties publishes a price for a finished building: five such sites were read on 2026-09-20 and each offers an estimate by form or phone. On an erection-only job the number moves with span and eave height, access to the pad for the crane and trucks, what the ground under the slab calls for, how much of the package is already on site and how much is still on order, the doors and trim, and the agency fees, which are the only part of it anyone can quote in advance.
Bring the drawings that came with the package, the anchor bolt plan, the delivery date if you have one, and the address. Those four make the difference between a range and a price.
The builders' own pages were read and print no such price. FromSeven Texas metal building company websites, five of them naming the Austin area (read September 20, 2026).
Questions on permits and pricing, from the record
Does steel erection for pre-engineered packages in Central Texas include the slab?
No. A Texas manufacturer that publishes kit prices on its own site states that the listed price is for the building kit only, that tax, freight and the door are not included, and that it does not provide the foundation or offer installation or erection. The slab is a separate design and a separate pour, sized from the frame reactions on your own drawings and from what the ground under the lot does. One independent metal building contractor can price the slab and the erection together.
Whose name goes on the permit if I bought the steel package myself?
The owner's, at whichever office has the lot. Buying a package opens no permit file anywhere. On a covered building at or above the $50,000 line, Government Code 469.102 fixes the order: plans reach the Texas Department of Licensing and Regulation first, and only then may the owner file for a local building permit or begin building, while the local permit official accepts nothing until that registration is verified.
Does a pre-engineered package still need a Texas engineer?
Sometimes, and the package answers only part of the question. Occupations Code 1001.056(a)(2)(F) frees plans from engineering licensing for a single-story building within 5,000 square feet whose clear spans stay at 24 feet or less across the short side, when the public is offered no engineering services. Past that span, subsection (b) calls for the roof-supporting members (trusses, beams and the like) to be engineered or pre-engineered. Subsection (c) withdraws the exemption for a residential slab on expansive soil unless the work meets the residential code as applied in the jurisdiction.
Is a steel erector licensed in Texas?
No, and neither is any builder or general contractor. None of the 41 regulated industries on the Department of Licensing and Regulation's roster covers either, and the Sunset Advisory Commission records that the Legislature did not continue the Texas Residential Construction Commission in 2009, its Act expiring September 1, 2009. The trades inside the shell are licensed on their own: electricians and heating, air conditioning and refrigeration contractors through TDLR, plumbers through their own board, the Texas State Board of Plumbing Examiners.
Pricing request, six fields, no charge
Pricing request: Steel erection of pre-engineered kits
Fill it in this order: county first, since it names the permit desk; then the building; then the start window, which sets what gets looked at first.
Last stop on the routing sheet: the price
Each request is routed to one independent contractor and is not sold to any lead list.
Sources re-read September 20, 2026.